INFRASTRUCTURE




01AIRPORTS

EXPANSION AND RENOVATION PROJECT (T3A TERMINAL) OF THE CAPITAL AIRPORT:

The terminal is located in Chanyang District, Beijing. It totally used 7500tons of steel. The project was commenced in August 2005 and completed in August 2006. This is a key project of our state, totally involved 26 fixed boarding bridges. 23 boarding connected bridges, steel floating island, direct command corridor, retail booth, etc. This is an image project of the airport and has extremely high quality requirements.

Image
STAGE II EXTENSION PROJECT FOR T3A TERMINAL XI’AN XIANYANG INTERNATIONLA AIRPORT:

The mani building has a total building area about 14000m^2; the steel structure on the roof features tree shaped steel column bearing space steel tube truss.The roof has a north-south lenght about 332m and a west-east width about 142m. Eighty steel columns support 20 trusses. The truss rod is made with hot rolled seamless hollow tubullar. The connection points for tubular are all the instersection nodes.

Image
NEW HANGAR OF ETHIOPIAN AIRLINES:

The new hangar is located in Bole Airport in the southeast corner of Addis Ababa, the capital of Ethiopia. The project was commenced on January 3, 2013 and it will last for 915 days. The total floor area of the hangar is 33,900 square meters, with the span of 82 meters and the depth of 90 meters, and the height on both sides of the bottom chord truss is 20.5 meters and the middle part is 25.5 meters.

Image


02BRIDGES & FLYOVERS

CABLE STAYED BRIDGE IN SHENBEI DISTRICT:

The bridge is located in Shenbei district, Shenyang, totally 2050 tons of steel was used, the bridge crosses Pu River, it was commenced in August 2007 and completed in March 2008. The bridge span is about 100meters and the deck is about 35meters wide, this is a single span single cable surface double –back independent tower bridge. The main beam was a reinforced steel box beam with a length of 99.95 meters. The bridge tower used single-column linear steel tower column, the tower is 58.72meters high and the horizontal angle of the tower was 75.052⁰. This was the first steel leaning tower cable –stayed bridge in the Northeast China Region, independent tower and cable-stayed, cables were arranged in a Y shape, the design is advanced and novel. The project won the gold medal for 2008 China Construction Steel Structure Award.

Image
CIHAI BRIDGE IN TIANJING:

Project site: Tianjin
Project amount: 4383 tons
Contract value: RMB 41.56 million

It is located at the mouth of Sancha River and crosses the Ziya River to connect Wuma Road in Hebei District and Santiaoshi Heng Street in Hongqiao District,with alangth of 330m and a span of 100m. The bridge is dual-floor structure where in the top floor six lanes used exclusively by motorized vehicle,with a central span of 30m, gradually by motorized vehicle, with a central span of 30m, gradually narrowing towards two ends and finally joining smoothly a 25m-wide road; the lower floor sidewalk.

Image
BEIJING RAIL TRANSIT CHANGPING LINE CROSSING JING-BAO RAILWAY:

Project site: Changping District, Beijing
Project amount: 2348 tons
Contract value: RMB 22.03 million

It is located between Beijing road station and XI' erqi station in Changping line to cross Jing-Bao railway, northeast ring railway, JIng-Lan railway under planning and reserved linr for secondary Jing-Bro railway. It uses the continuous steel-concrete structure beam with single span of 79m.

Image
BENGBU BRIDGE IN TIANJIN:

Project site: tianjin
Project amount: 2900 tons
Contract value: RMB 30 million

It is located between urban secondary trunk road. The master bridge has a width of 23.5m wide; the auxiliary bridges have a respective net width of 3m. Haihe river west end joins Bengbu Avenue and Haihe river east end joins Shisanjing Road. The bridge is of light asymmetric structure,appearing lightsome and transparent, disclosing astrong space sense.

Image
GUANGLIHE BRIDGE OF DONGYING CITY, SHANDONG PROVINCE:

Project site: Dongying City, Shandong Province
Project amount: 1928 tons
Contract value: RMB 29.39 million

It is modern style landscape bridge, a length of 130m, a span about 90m and a master bridge width of31m.It adopts bidirectional four lanes,with two side respectively as non motor vehicle lane and sidewalk. The bridge has five spans;the largest span is 40m wide.The body uses the steel box girder,with single weight upto 130 tons.

Image
STEEL BOX GIRDER BRIDGE IN NORTH TONGHUIHE ROAD:

Project site: Tongzhou District, Beijing
Project amount: 6400 tons
Contract value: RMB 54.4 million

It is a key radial line to connect the Beijing to 2nd,3rd and 4th ring roads.It is located at the north bank of Tonghuihe River,with a length of 4.6km.It starts from Dongbianmem Bridge in 2nd ring road and crosses 3rd ring road to reach the final Shihui Bridge in 4thring road where it could join the Jing-tong quick road.

Image
ZHANXI ROAD OVERPASS BRIDGE IN BEIJING:

Project site: Haidian District, Beijing
Project amount: 4500 tons
Contract value: RMB 37.8 million

Zhanxi Road is located in Haidian District and trunk road which is north-south though beteen 2nd ring road and 3rd ring road, with the length about 1800m.It crosses Beijing Zoo.In order to reduce the impact on the animal from the vehicle noise,most part of it is shrouded with the acousic celotex board.

Image
BEIJING SUBWAY DAXING LINE:

Project site: Daxing District Beijing
Project amount: 1190 tons
Contract value: RMB 18.35 million

It is located between Xingong station and West Hongman station in Daxing line of Beijing rail transit, with a length of 189m.The largest single span is 89m, which is the largest in current beijing. The steel girder is variable cross-section. The construction used high quality Q37Oqe steel plate with largest thickness of 48mm for the first time. It is strict for welding deformation control. The V-shaped buttress has compllcated structure,high accuracy requirement for installation and positioning. The weight of the singal steel girder could be up to about 240 tons.

Image
BEIJING SUBWAY RAILWAY BRIDGE:

Project site: Chaoyang District Beijing
Project amount: 4594 tons
Contract value: RMB 38.47 million

It is a steel railway bridge which demands a high manufacture quality against short con

Image
FUSHI ROAD OVERPASS BRIDGE STAGE II PROJECT:

Project site: Mentougou District and Shijingshan District, Beijing
Project amount: 8631 tons
Contract value: RMB 75.15 million

The stage II project starts east from Jinyuan Bridge in west 5th ring road to west Shuangyu round island in Mentougou Distirct, with a length about 9.6km. It is an overpass quick road to connect the urban center zone to the urban west zone. Amoung,the No.3 bid is such one as crossing the railway.

Image
INTERCONNECTION LINE BRIDGE BETWEEN JING-TONG EXPRESSWAY AND JING-HA EXPRESSWAY:

Project site: Tongzhou District, Beijing
Project amount: 2190 tons
Contract value: RMB 18.18 million

The project is located at Yongshun Town in Tongzhou District,Beijing. The body structure is steel box girder. The bridge has a length of 174.2m and a width of 27.2m,with largest single section up to 60.5t.

Image
Image
Image
Image


03HIGHWAYS

Image
Image


04HOUSING & HOTELS

GRAND PANGU PLAZA:

The Plaza is located in Beichen Bridge, Chaoyang District, and the construction was commenced in December 2006 and completed in April 2009. The total area is 420000 square meters, composing of 15A-class office building, 3 international apartments, 1 seven star hotel and 1 world class commercial corridor-the Dragon Corridor, with a length of 411meters, as well as the 12 airborne quadrangle courtyards on the roof of the 3 international apartments, all in 5 unique architectural forms. The entire project takes the 191.65meters office building as the dragon head and Pangu seven-star hotel as the tail, extends from south to north for about 600meters. The whole building is just like a white dragon, adjacent to the Water Cube and Bird Nest, and has become a classic “Name Card” of Beijing.

Image
SHENYANG DONGA INTERNATIONAL CENTRE:

The centre is located in Heping district, Shenyang, it used a concrete-filled steel tube column-steel beam-concrete cylinder structure, totally 9000tons of steel was used, the tower is 207.9meters high, and the project was commenced in July 2011 and completed in July 2013. The maximum cross section of the steel pipe column was 1500X45mm, the core cylinder is an irregular H-shaped steel beam and column, which are quite difficult to be manufactured.

Image
NEW YUNNAN CROWN HOLIDAY HOTEL (YUNNAN MANSION):

Project site: Chaoyang District, Beijing
Project amount: 2000 tons
Contract value: RMB 14.4 million

The project is located at the south (A) of the Solar Center in the Solor Palace in Chaoyang District.It is a 28-floor building which includes three underground floors and twenty-five ground floors, with a total building area of 93788m^2. It uses the structural steel concrete structure. steel box girder. The bridge has a length of 174.2m and a width of 27.2m,with largest single section up to 60.5t.

Image
ZHONG JI PLAZA-OFFICE BUILDING IN LUANDA, ANGOLA:

The building is located in Luanda city, Angola. A steel column-steel beam-concrete tubular structure was adopted for phase I , with total of 4448 tons of steel used and the completed building is 105.9meters high. The project was commenced in June 2007 and completed in October 2007. A full structure was adopted for Phase II, with total of 7860 tons of steel, and the building was 122.4 meters high. Phase II was commenced in May 2012 and completed in July 2013. The building has been a landmark.

Image
TAIHUA LONGQI PLAZA:

Project site: Changping District, Beijing
Project amount: 2500 tons
Contract value: RMB 10.75 million

It is located at Huilonggguan area in Changping District, with a building area of 26340m^2,including three underground floors and sixteen ground floors.It uses the steel tube concrete frame plus steel support system.

Image
ZHONGLIAN INTERNATIONAL CULTURE AND ART DEVELOPMENT CENTRE:

The centre is located in Heping district, Shenyang, it used a concrete-filled steel tube column-steel beam-concrete cylinder structure, totally 9000tons of steel was used, the tower is 207.9meters high, and the project was commenced in July 2011 and completed in July 2013. The maximum cross section of the steel pipe column was 1500X45mm, the core cylinder is an irregular H-shaped steel beam and column, which are quite difficult to be manufactured.

Image
SCIENCE REASERCH BUILDING IN BEIHANG UNIVERSITY:

The centre is located in Heping district, Shenyang, it used a concrete-filled steel tube column-steel beam-concrete cylinder structure, totally 9000tons of steel was used, the tower is 207.9meters high, and the project was commenced in July 2011 and completed in July 2013. The maximum cross section of the steel pipe column was 1500X45mm, the core cylinder is an irregular H-shaped steel beam and column, which are quite difficult to be manufactured.

Image
SHOUGANG HOSPITAL OF PEKING UNIVERSITY:

The hospital is located on Jinyuanzhuang Road, Shijingshan District, Beijing, this is a general top three hospital integrating medical, prevention, care, rehabilitation, first aid, teaching and scientific research. The hospital is in Xihuang Village, totally covers an area of 90,000 square meters. The newly built 19-storey ward building is advanced, practical and rationally arranged in layout, the medical service function reaches the first-class level in the domestic. The hospital has 1000 patient beds, totally covers an area of 50,000 square meters. The project is commenced in December 1997 and completed in December 1999, it is composed of 2 underground floors and 17 ground floors, an in-situ concrete frame structure is applied, externally and internally closed through light walls, the building is 64.4m high.

Image
2000 HOUSE UNITS AND SUPPORTING MUNICIPAL ENGINEERING IN LUHONGGU, BENGUELA, ANGOLA:

The project is located in Luhonggu, Benguela Province, Angola, which was developed by the local government to solve the livelihood problem. The project covers an area of 7 square kilometers, including 2000 sets of residential units, public supporting buildings, sewage treatment plant and other municipal facilities. The project was commenced in May 2012 and planned to be delivered in May 2015.

Image
FENGCHENG INTERNATIONAL TRADE COMMERCIAL COMPLEX:

The Complex is located at the intersection of Weiguo Road an Beixin Street in Lubei Dwastrict, Tangshan, this is a large urban complex integrating residence, shopping, entertainment, catering, relaxation and some other industrial forms; the most high-end garden-style shopping plaza. The project was commenced in 2013 and plans to complete in 2015. The Complex totally covers an area of 460,000 square meters and adopts a reinforced concrete shear wall structure, its ground floor area is about 350,000 square meters, including 1 5A-class office building with a height of 150m, 3 high-end apartments and 4 high-tech residential buildings; the underground area is about 110,000 square meters, divided into 4 floors with a maximum depth of 22m. It is the deepest building under construction in Tangshan. The project was awarded the title of National 100 City Landmark, when it is completed, it will become a landmark of Tangshan city.

Image
XINXING SHENGSHI PLAZA:

The Plaza is located at South Jianguo Road, Tiedong District, Anshan, it totally covers an area of 240,000 square meters, composed of 2 underground floors and maximum 30 ground floors, a reinforced concrete shear wall structure was applied. The project was commenced in February 2010 and completed in June 2011, thus it is the first large urban complex project in Anshan, meanwhile, it is the largest, the most high-end and the most influential urban complex in Anshan, it integrates office, business, shopping, resident, hotel, entertainment and other functions. The project reflects the high quality and high-standard construction principle of SGCG, it has been listed as one of the landmarks of An’shan.

Image
YONGTAI COMMERCIAL COMPLEX:

This is a strategic cooperation project jointly completed by SGCG and Yongtain Real Estate Corporation. The project was commenced in November 2013 and plans to complete in November 2016. The Complex is located at the intersection of South Xing’an Road and the 2nd South Ring Road in Hohhot, it integrates high-rise residents, flat-floor apartments, A-class office building (47 floors, about 200m high), large shopping centers and international five-star hotel (the office building and the hotel adopt a rigid reinforced concrete structure), thus it is a multi-purpose business cluster and international urban life area, it totally covers an area of 600,000 square meters. When completed, it will become a new landscape of the city.

Image
JADE GARDEN VILLA:

The Villa is located at the intersection of Tangwang Avenue and Yangsheng Avenue in Bozhou, Anhui Province, it is planned to cover an area of 250,000 square meters, an overall “dragon and phoenix” landscape will be displayed, the total floor area is 650,000 square meters. The project is composed of 11 18-floor high-rise residential buildings (reinforced concrete shear-wall structure), 15 11-floor residential buildings (reinforced concrete framework structure), 4 commercial buildings (reinforced concrete framework structure), 1 guild hall (reinforced concrete framework structure), 79 villas (reinforced concrete framework structure) and 1 building for primary school (brick-concrete structure), thus this is a high-end residential community in an ArtDeco Style. Phase I of the project was commenced in 2012 and completed in the end of 2013, phase II was commenced in 2013 and planned to complete in the end of 2014.

Image
ORIENTAL PEARL CITY PROJECT:

The buildings are located in Nanli Village, Haigang District, Qinhuangdao, Gangcheng Street to its north, Xingdian Road to its east, Jianshe Avenue to its south and Xinkai River to its west, thus it enjoys convenient traffic, the straight distance from the buildings to the sea is not longer than 1700 meters. The project was commenced in 2007 and completed in October 2011, reinforced concrete shear wall structure was cast on the site. A1 building covers an area of 53,200 square meters and is the single building with the largest area, the project was composed of 1 underground floor and 32 ground floors. The maximum building height is 96.15m and the total construction area is 360,000 square meters. The community is adjacent to Xinkai River, the only seawater River in Qinhuangdao, to its west, there is a band-shaped garden along the river with an area more than 50,000 square meters, the garden improves the anion content and air quality, thus Xinkai River has become another landscape highlight in this city.

Image
VANKE HOLIDAY PARK:

The Holiday Park lies to the north of Yongda Street, Fushan District, Yantai, Shandong Province, it was a significant development project of Vanke Group in Yantai. The project was commenced in October 2012 and plans to complete in September 2015. The project applies a reinforced concrete shear wall structure and totally covers an area of 200,000 square meters, it is composed of 19 single buildings, which are required to be constructed synchronously as a whole. Vanke’s unique project management mode and rigorous high-quality standard propose great challenges to the construction company, Shougang Construction Group fully demonstrates the overall strength of the enterprise, in the flying inspection in 2013, the project won average score first in Yantai area and was awarded as Vanke Group Yantai area annual “project quality award” and “Safe and Civilized Community in Shangdong”.

Image
VANKE NEW MILEAGE PROJECT:

The buildings are located on Yuhua Avenue, Lubei District, Tangshan, Hebei Province, it was commenced in June 2013 and plans to complete in October 2016. The project totally covers an area of 280,000 square meters and adopts a reinforced concrete shear-wall structure. The project was composed of 13 medium and high-rise residences (220,000 square meters), 8 shops (15,000 square meters) and an underground garage (43,000 square meters). When it is completed, it will become a new landmark of Tangshan and a new city card jointly created by Shougang and Vanke (Tangshan).

Image
JINSHANFU TOWER:

Location:Hebei, China;Construction period: November 2012 - July 2013
Description:reinforced concrete, antique building height 58 meters. the architectural style shows ancient charms and reflects profound hwastorical and cultural heritage.It was able to contract the repair, migration and reconstruction project of important relics designated by the national key cultural relics protection units and the National Heritage Board.

Image


05STADIUM

GENERAL BUILDING AND LEISURE CENTER & GYM IN INTERNATIONAL SPECAILIST SERVICE CENTRE IN TANGHAI COUNTRY

Location:Hebei, China;Construction period: November 2012 - July 2013
Description:reinforced concrete, antique building height 58 meters. the architectural style shows ancient charms and reflects profound hwastorical and cultural heritage.It was able to contract the repair, migration and reconstruction project of important relics designated by the national key cultural relics protection units and the National Heritage Board.

Image
SHOUGANG BASKET BALL CENTRE:

The centre is located on Fushi Road, Shijingshan District, Beijing. This is a comprehensive modern stadium integrating sport competition, sports culture, entertainments, performances, exhibitions and other functions. It is composed of 6000 audiences’ seats and 17 VIP boxes. It is the first stadium in China which is designed and constructed standard for NBA venues, the project was commenced in 2000 and was put into formal use in December 2001. The stadium covers an area of 25000square meters, 128 meters long and 60metres wide, its appearance is an oval just like a whale. Equipped with aluminium curtain, glass curtain wall and sleek roof, all the four entrances have their own characteristics, the east and west sides were dominated by yellow in colour, symbolizing the excellence sports has become a venue site for important contests, such as CBA, WCBA and domestic large-scale theatrical shows.

Image
CHANGPING GENERAL GYM:

The project is the product of the addition and reconstruction to the velodrome used by 11th Asian Games.The gym is oval, with a long axie of 156m and a short one opf 125m. It has a total building area of 22556m^2. because the project uses the original structure of the velodrome,the additional upper steel roof uses four steel columns for bearing which have a diameter of 2m and a height of 65m.The diagonal steel wire ropes extend from the steel column to overhang the master and slave frames. Which cooperate with the surrounding circle small steel columns to from a steel roof system with an elevation of 10m and above .The whole roof system consumed more then 3000 tons steel.

Image
ANCILLARY FACILITIES IN CONFERENCE CENTRE IN OLYMPIC PARK:
Image
CHINA INTERNATIONAL TENNIS CENTRE:
Image